Opens in a new tab

Electrician Marketing Agency

You run your electrical company on installed jobs.So why is your agency only focused on leads?

Own your home market. Open the next one. Close more of the estimates you already run.
See where your next growth dollar does the most work before you spend it.

A $351 service call and a $5,157 generator aren’t the same job.

What’s one more sale in ten estimates worth to you?

$
%
Starting points: our sales floor record (2,135 appointments run over 27 months, about 79 a month, with 761 sold, 35.6%; a different trade, measured the same way) and Angi’s 2026 national prices: panel upgrade about $1,600, standby generator $5,157 average across 4,364 projects, full rewire about $7,500 at $2–$4 a square foot on a 2,500 sq ft home. Change all three to yours.

a year

$151,680a year

That’s 8 more jobs a month. Can your crews put them in?

Added revenue, not profit, from one more sale in every ten estimates at the same volume and job value.
Talk to Andrew

THE OPERATOR RECORD BEHIND THE METHOD · 27 MONTHS OF DOCUMENTED PIPELINE PERFORMANCE

11,564
Leads worked
2,135
Appointments shown
761
Sales closed
35.6%
Show-to-sold
$34M+
Closed revenue

Different businesses. Always the same pipeline mechanics. Leads still have to become appointments, sales, and revenue.

What does effective electrician marketing look like in 2026?

Effective electrician marketing starts with the job mix, not the lead count. The average electrical job in the US is $351, but a panel upgrade runs about $1,600 and a standby generator averages $5,157 (Angi 2026). The same marketing dollar can buy either one. A strong system does three things. It gets the company found for the work it wants more of, gets every call answered and booked, and turns estimates into signed installs the crews have room for. Measure it by what’s installed and paid for, by job type, and the next dollar goes where it earns the most, not where the last agency pitched.

The numbers behind it: Google Local Services Ads for electricians cost about $39 a lead, and 43.4% of them book a job (SearchLight, February 2026, 112 electrical accounts). That’s about $90 per booked call. A booked call isn’t a sold job, though. A service visit is paid the day it’s done. A panel or generator still has to be estimated, sold, permitted and installed. Most electrician marketing is never measured past the call.

Why generic marketing fails this trade

Marketing for electrical contractors has to answer four numbers.

An agency that runs the same “more calls” plan for every electrician is pricing your generator install like a breaker reset.

1 · The mix
$351 to $5,157

Four trades under one roof

The average electrical job is $351. A panel upgrade is about $1,600 and a standby generator averages $5,157. Every call costs about the same to win. What each one is worth depends on which job it is.

Angi 2026
2 · The clock
Hours, or weeks

Two buyers, two timelines

Someone with a dead circuit calls whoever answers first. Someone pricing a generator compares three companies over weeks. One marketing plan can’t win both.

Buying-cycle pattern; no single benchmark
3 · The crew
81,000 a year

Openings nobody can fill fast

Electrician jobs are projected to grow 9% from 2024 to 2034, with about 81,000 openings a year. For most electrical companies the crew, not demand, is the limit.

BLS Occupational Outlook
4 · The gap
43% booked

Booked isn’t sold

About 43% of electrical Local Services Ads leads book a job. That’s where most reporting stops. For install work, the estimate, the sale and the install all still have to happen.

SearchLight, Feb 2026, 112 electrical accounts

An electrician marketing system counts what these four add up to, sold and installed work by job type, and builds an engine you keep. Own the pipeline.

Not sure whether your problem is visibility, response or the work you’re buying? See it in about 90 seconds, with your own numbers.

Your job mix

Electrical contractor marketing by job type: how each one is bought

Six kinds of electrical work, six different buyers. Marketing that works for one can waste money on the next.

Service and emergency repairs

Bought in hours

The homeowner calls whoever answers. Win it with the map pack, Local Services Ads and a phone that’s picked up on the first ring. The real value is the panel or rewire the tech spots on the visit.

Panel and service upgrades

Bought in days to weeks

Often triggered by an inspection, a home sale, an addition or a new appliance. Win it with search pages for the upgrade itself, a fast estimate and clear pricing ranges. About $1,600 on average (Angi 2026).

Standby generators

Bought over weeks, and in a rush after an outage

Researched, compared and financed, then demand spikes after every storm. The average customer lost about 11 hours of power in 2024, the most in ten years (EIA), and Helene hit East Tennessee. Win it with content that answers sizing and cost questions, a follow-up sequence and capacity planned before the season. $5,157 average (Angi 2026).

Rewiring and renovation work

Bought through the job it’s part of

Older homes, remodels and additions. The median owner-occupied home is 42 years old (NAHB, 2024). Win it with remodeler and realtor referrals, plus pages for older-home wiring. A full rewire runs about $5,000–$10,000 (Angi, $2–$4 a square foot).

EV chargers

Bought with the car

A Level 2 install averages $967, plus $800–$2,000 when it needs a panel upgrade (Angi 2026). The federal charger credit ended June 30, 2026, so sell the install and the panel check, not a rebate.

Lighting and smart-home upgrades

Bought when the budget allows

Lower urgency, higher-budget homeowners. Best as an add-on to work you’re already doing in the house, not a paid-ads priority.

Which of these you spend to win decides what your marketing is worth. The tool above shows it in your numbers.

The 6-Gap Revenue Map™

Which gap is costing your electrical company the most?

Six gaps stand between a homeowner’s search and a booked job. Five are gates, and they don’t add up, they multiply.

Example scan · a composite company
10,000searching
1,270found you
GAP 1Visibility12.7%31/100find your site
1,080considered you
GAP 2Authority85.0%91/100consider you
30became leads
GAP 3Trust2.8%58/100become a lead
17reached in time
GAP 4Speed57.0%44/100reached in time
3.7booked jobs / mo
GAP 5Conversion21.5%22/100book the job
GAP 6AttributionNot a gate — the flywheel. It decides whether next month’s 10,000 do better than this month’s.
3.7 → 7.6

Worst score: Conversion. Biggest lever: Visibility. Take Visibility from 31 to 78 and 3.7 booked jobs a month becomes 7.6. That’s what multiplying means.

Ninety seconds tells you which gap is doing the damage — rarely the one the last agency pitched. Nothing is saved; it runs in your browser.

Already ran it? Skip to what we build & run ↓

The 6-Gap Revenue Map™

Six things decide whether a search turns into a booked job. We measure all six, score them, and hand you the one that costs you most. Here is the instrument, running.

Example scan  a composite contractor. Every finding on it is one we have written about a real business.
Where 10,000 searches actually go
0 booked jobs / month
Pass rates are interpolated between published bottom-quartile and top-quartile benchmarks. Click any gate for its source.

Click any gate to hold it while you read. The scan picks back up after 20 seconds.

10,000 searching
Auto-scanning all six gaps…

This is an example. Yours runs on your actual site, your actual competitor, your actual reviews.

Get my real scan →

Takes 30 seconds to request. No call, no pitch. Your gaps documented on video within 48 hours.

Before you buy more calls

Booked out three weeks? More marketing isn’t the fix.

An electrical company with a three-week install backlog doesn’t need more demand. It needs better demand. That can mean shifting spend toward higher-value work, raising prices on the jobs that sell themselves, tightening the schedule, or adding a crew before adding a campaign. Each one is cheaper than marketing you can’t install. When the crews are the limit, our answer on more marketing is two words: Not yet. We’ll show you the math.

What we build & run

The seven parts of an electrician marketing system, in the order they usually pay

A system with six strong parts and one weak one performs at the level of the weak one. The map above shows which part leaks most, and we start there, not at the top of this list.

Calls get answered or returned in minutes, routed to service or sales, and confirmed so the homeowner is home when the truck arrives. Every estimate gets a follow-up sequence until it’s signed or lost. Every other part rides on this one.

The detail most pages skip
Most electrical companies lose more work after the call than before it, through a missed callback, an estimate never followed up, or a generator quote left sitting.

Local Services Ads for the calls that need a pro today, at about $39 a lead with 43.4% booked (SearchLight, Feb 2026). Search campaigns built by job type, panel, generator and rewire, so install work isn’t buried under service calls. Judged on cost per sold job by job type, never cost per click.

Everything here produces homeowners who contacted you alone. Shared marketplace calls go to several electricians at once and become a race on price. The engine you build is yours to keep when any engagement ends.

A page for each kind of work you want more of, and each town you serve. Price ranges where the homeowner is deciding, proof of licensing and permits, and one clear next step: book the estimate.

Every customer asked after every job, every review answered, in the words buyers search. A good service call becomes next year’s panel upgrade and the neighbor’s generator.

The detail most pages skip
The techs on service calls are your best source of install work. Track what they find, and follow up on it.

A fully built Google Business Profile, steady reviews, and pages for each job type and town. The money is in “panel upgrade [town]” and “generator installer near me”, not vanity keywords.

Every call, form and estimate traced to its source and followed to sold, installed and paid, by job type. Monthly reporting starts at cost per sold job, so next month’s budget goes where the work is worth most. Better data. Better decisions.

The number that decides everything

What an electrical job really costs to win: same lead, three very different jobs.

Every vendor sells you cost per lead. What matters is what it costs to win a job, and how much of the job that eats.

$
%
%
Job
Service call, $351 average
$90
26%of the ticket
Booked is sold, so about $90 to win one, 26% of the ticket.

Same $39 lead. The service call costs a quarter of what it brings in, and the generator costs a twentieth. Two electrical companies can spend the same marketing money and end up with very different businesses. The difference is the mix they chase and what happens after the call.

Sources: SearchLight, Feb 2026 (electrical LSA: $39 lead, 43.4% booked); our sales floor record (35.6% of appointments that showed); Angi 2026 job prices. Other channels cost more, so change the inputs to yours.

What to spend, by stage

How much should an electrical company spend on marketing?

There’s no universal percentage. Anyone quoting “7–10% of revenue” before asking your job mix and close rate is guessing with your money. Pick your stage.

Under $1M

Buy your first predictable channel

One channel that reliably books the work you want, on a site that converts and a claimed Google Business Profile. Prove what a sold job costs, then stop guessing.

$1M–$3M

Shift the mix

Your service calls pay the bills. Now aim new spend at panels, generators and rewires, and track each separately, so you know which is worth more.

$3M–$10M

Build the machine

Search, Local Services Ads, reviews and follow-up running together, measured to the installed job. This is where a second market starts to make sense, if the crews are there.

$10M+

Defend and expand

Protect the markets you own, and open new ones with a model, not a guess.

Timing

Build before storm season, not after it. Generator demand jumps after every major outage, and the companies that rank and have reviews when it hits get the calls. Marketing switched on the week the power goes out is too late.

The question at every stage

What does it cost to win one sold job today, and does the next dollar return more than it costs? Sometimes the crews are the limit and the answer is Not yet.

Proof you can check

No electrician case studies yet. Here’s what we can show.

We won’t borrow results from other trades and call them electrical. When we publish an electrician case study, it’ll be with the client’s books open and permission in writing. Until then, the method has documented results in adjacent home-service trades:

Home services · map-pack rank (lower is better)
5.4 → 2.5
An established plumbing company in East Tennessee: average map-pack rank across the tracking grid in 72 hours. #1 for 14 of 16 service terms, and it held.
BrightLocal, Apr 2026
Real estate · same rankings, more clicks
+32% CTR
+36% organic clicks in 30 days on the same rankings, before a single new page.
Google Search Console, 2026

Client results anonymized by industry. Each is documented and can be walked through on the call.

The comparison that matters

Three ways electrical contractors buy marketing.
Only one leaves you owning the engine.

What you’re really comparingLead marketplaces (shared leads)A generalist contractor agencyElectrician marketing by Andrew Ryan Marketing
Who else gets the callOften several other electricians, at once.Possibly another client of theirs in your market.Nobody. One electrical company per market, defined in writing at signing.
What the plan is built onVolume. The marketplace wins when you buy more.A template shared with plumbers and roofers.Your job mix: what each kind of work is worth, how it’s bought, and what your crews can install.
What gets measuredLeads delivered.Traffic, rankings, calls, and a monthly PDF.Cost per sold job by job type, every month, traced to installed revenue you can verify.
When you spend moreWhenever you want more leads.When the agency recommends it.When the numbers prove the next dollar returns more than it costs, and after we check the crews can install it.
What you keepNothing. Stop paying and the calls stop.Often not the ad accounts, the tracking or the data.Your site, ad accounts, data, automations and reporting, from day one and after we part. Build capability, not dependency.

Every price range is on the pricing page, so you can rule us in or out before a call.

Who it’s built for

Electrical contractors nationwide, and here at home in Johnson City and the Tri-Cities.

Residential electrical contractorsCrews doing service and installs, ready to shift the mix toward the bigger jobs.
Generator and panel specialistsSelling a researched, financed install with a real estimate step.
Multi-market electrical companiesOpening a new county with no reviews and no referrals, and needing a predictable cost per sold job there. New-market marketing →
Johnson City and the Tri-CitiesElectrician marketing for Johnson City, Kingsport and Bristol companies, run by the founder, in person. Local SEO in Johnson City →

The questions electrical contractors actually ask about marketing

There’s no universal percentage. Agencies quote 7–10% of revenue, but the number that matters is what it costs to win one sold job of the type you want, and whether the next dollar returns more than it costs. A company chasing $5,000 generator installs can spend far more to win each job than one chasing $351 service calls and still come out ahead. Start with your job mix and close rate, then set the budget.

Google Local Services Ads averaged about $39 a lead for electrical contractors in February 2026, with 43.4% booking a job (SearchLight, 112 electrical accounts). Search ads usually cost more. Cost per lead on its own tells you little. Cost per sold job, by job type, tells you what the lead was worth.

The ones with the most value your crews can install profitably. For most residential contractors that’s panel and service upgrades (about $1,600), standby generators ($5,157 average) and rewires ($5,000–$10,000), rather than more $351 service calls (Angi 2026). Service calls still matter, because they’re where techs find the bigger work.

Both, in sequence. Local Services Ads and search ads bring calls within weeks and fund growth while SEO builds. SEO and the Google Business Profile take 3–6 months, then lower what every job costs to win. Run ads first, build SEO underneath, and judge both on cost per sold job.

Yes, as one service line, not a growth bet. A Level 2 install averages $967, plus $800–$2,000 when it needs a panel upgrade (Angi 2026). The federal charger credit ended June 30, 2026, and EV sales fell in 2026, so sell the install and the panel check, not the rebate.

They can fill gaps, but a shared lead goes to several electricians at once, and you compete on speed and price before the homeowner knows who you are. The calls you generate yourself, from your own site, profile and ads, come to you alone, and the engine stays yours.

Be found before the outage, not after it. Generator buyers research for weeks, then demand spikes after every major storm. Rank for generator searches in your towns, publish clear sizing and cost answers, follow up on every quote, and plan install capacity before the season.

Every price range is on our pricing page. Engagements are built around the problem you’re solving: winning more of the right jobs, closing more estimates, or opening a new market. Media spend passes through at cost, and there are no setup fees.

You built the reputation. Now aim it at the work your crews want, in the next town too.

See what your job mix is worth before you spend another dollar.